![05 -13 February 2018, Olten (Switzerland) – IRIS DELTA analysis at EAO AG](https://www.cc-rail.info/wp-content/uploads/2017/09/csm_EAO-Series-61_e-stop-compact_f2cc62947b-411x218.jpg)
CC-Rail conducted an IRIS DELTA-analysis at EAO AG in Olten (Switzerland) in order to support the company’s preparation prior to the IRIS transition audit.
As usual provided CC-Rail detailed results in a comprehensive “system audit report” and structured its content in several functional work-packages, which facilitate the direct implementation o improvement actions.
.
4
APR
APR
0